
Home/Projects
Selected industrial asset engagements completed by Combined Tech for major Pakistani mills and energy operators. Open a case study for the process detail. Commercial values stay confidential.
Case studies
Each card opens a dedicated case study post describing real completed work: briefing, evaluation, confidential matching, documentation, and close-out. We do not publish transaction prices, historical rate tables, or unverified buyer counts.

Textile manufacturingGenset spare parts (Caterpillar, Jenbacher, Waukesha)
About 8 weeks, briefing to documented close-out
Genset spare-parts bid work across Caterpillar, Jenbacher, and Waukesha lots: structured quotation, confidential matching, and close-out in about eight weeks.
Read case study →
Power and energyPower house gensets and electrics
About 6 weeks, technical briefing to completion
Power house gensets, panels, and related electrics completed through inspection-led evaluation and a six-week confidential sale path.
Read case study →
Textile manufacturingProcessing and finishing machinery
About 7 weeks, operating-site briefing to handover
Processing and finishing machinery prepared on a live mill floor, then matched confidentially across a seven-week completion path.
Read case study →
Textile manufacturingMill machinery clearance package
About 9 weeks, constraint mapping to close-out
Thirteen surplus machines cleared through lot integrity, fit-based matching, and a nine-week accountable close-out.
Read case study →
Textile manufacturingConfidential surplus machinery disposal
About 5 weeks, confidential intake to handover
Confidential surplus textile machinery disposal completed through evaluation-first marketing and a five-week structured handover.
Read case study →
Textile processingTowel line and processing equipment
About 7 weeks, precise scope lock to close-out
Towel line and processing equipment scoped precisely, marketed confidentially, and closed through a seven-week follow-through path.
Read case study →
Power and electricalTransformer core recovery lot
Multi-stage recovery and matching engagement
Twenty transformer cores at approximately 93,500 kVA and 250+ tons handled through inspection-led evaluation, lot structure, and confidential matching.
Read case study →
Power house spare partsWärtsilä parts and Jenbacher spark plugs
Structured procurement and resale path
Combined Tech purchased Caterpillar, Jenbacher, and Waukesha genset parts from a legitimate mill and traded them to a verified industrial customer.
Read case study →
Industrial scrapMixed ferrous and non-ferrous scrap
Inspection, sorting, and confidential sale
Mixed industrial scrap across copper cable, stainless grades, motors, valves, iron, and aluminium handled as a defined commercial lot without public price listing.
Read case study →Next step
Share your plant context. Combined Tech will outline a structured process path for sellers or buyers.